Close

    Commercial

    Filter Document category wise
    Commercial
    Title Date View / Download
    Review of benchmark capital costs for Solar PV, Solar Thermal, and grid-interactive rooftop/small solar PV plants applicable from FY 2025-26 until revised by the Commission. 12/06/2026
    Accessible Version : View(6 MB)
    Regarding Chief Engineer (Distribution), Kumaon Zone, Haldwani to also look after the additional charge of Technical Member in CGRF at Haldwani from 01-06-2026 to till fresh appointment (OM no. 2945). 26/05/2026
    Accessible Version : View(280 KB)
    Regarding UERC (Tariff and Other Terms for supply of Electricity from Renewable Energy sources and non-fossil fuel based Co-generating Stations) (Second Amendment), 2025. 13/04/2026
    Accessible Version : View(462 KB)
    Regarding Generic Tariff for the Solar PV plants to be installed under Net Metering arrangement by the prosumer for the GRPV/GSPV plants commissioned during FY 2025-26 and onwards (Letter no. 1197). 28/02/2026
    Accessible Version : View(475 KB)
    Regarding compliance of UERC (Standard of Performance) Regulations, 2022 (1106). 26/02/2026
    Accessible Version : View(456 KB)
    Regarding laying of overhead fiber optical fiber cable on the electric poles. 23/07/2025
    Accessible Version : View(723 KB)
    Seeking clarification on benchmark capital cost for subsidy % calculation and on the 100% subsidy cap under Surya Ghar: Muft Bijli Yojna for grid‑interactive rooftop/small solar PV (≤10 kW). 19/07/2025
    Accessible Version : View(2 MB)