Commercial
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Regarding Generic Tariff for the Solar PV plants to be installed under Net Metering arrangement by the prosumer for the GRPV/GSPV plants commissioned during FY 2025-26 and onwards (Letter no. 1197). | 28/02/2026 |
Accessible Version :
View(475 KB)
|
| Regarding compliance of UERC (Standard of Performance) Regulations, 2022 (1106). | 26/02/2026 |
Accessible Version :
View(456 KB)
|
| Regarding laying of overhead fiber optical fiber cable on the electric poles. | 23/07/2025 |
Accessible Version :
View(723 KB)
|
| Seeking clarification on benchmark capital cost for subsidy % calculation and on the 100% subsidy cap under Surya Ghar: Muft Bijli Yojna for grid‑interactive rooftop/small solar PV (≤10 kW). | 19/07/2025 |
Accessible Version :
View(2 MB)
|