Close

    Commercial

    Filter Document category wise
    Commercial
    Title Date View / Download
    Regarding Generic Tariff for the Solar PV plants to be installed under Net Metering arrangement by the prosumer for the GRPV/GSPV plants commissioned during FY 2025-26 and onwards (Letter no. 1197). 28/02/2026
    Accessible Version : View(475 KB)
    Regarding compliance of UERC (Standard of Performance) Regulations, 2022 (1106). 26/02/2026
    Accessible Version : View(456 KB)
    Regarding laying of overhead fiber optical fiber cable on the electric poles. 23/07/2025
    Accessible Version : View(723 KB)
    Seeking clarification on benchmark capital cost for subsidy % calculation and on the 100% subsidy cap under Surya Ghar: Muft Bijli Yojna for grid‑interactive rooftop/small solar PV (≤10 kW). 19/07/2025
    Accessible Version : View(2 MB)